Backfilling and cutting trench for the ground beams.chiyman (0 votes)
Getting everything straight and levelled before the big concrete pour.chiyman (0 votes)
Getting everything straight and levelled before the big concrete pour.chiyman (0 votes)
First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.chiyman (0 votes)
A happy constructor with a Pepsi!chiyman (0 votes)
Another view of the footings before the concrete pour.chiyman (0 votes)
Clearing the way for the Concrete truck. (The chaps who had dug the holes had left the soil right by the edges of the holes).chiyman (0 votes)
Clearing the way for the Concrete truck. Next stage construction materials in the foregroundchiyman (0 votes)
Clearing the way for the Concrete truck. Workers Camp in Background!!!chiyman (0 votes)
Getting everything straight and levelled before the big concrete pour.chiyman (0 votes)
Another angle on the levelled land awaiting construction in 7 months time - after the rainy season which will allow the land to settle.chiyman (0 votes)