Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.chiyman (0 votes)
placing pegs in the ground as a depth guide for the ground floor slabchiyman (0 votes)
Materials for construction of the column formworkchiyman (0 votes)
Pouring concrete into the column formwork - a highly manual process - effective though!!chiyman (0 votes)
A delivery of Yucca poles freshly cut which will be used later for the first floor constructionchiyman (0 votes)
Further ground floor to first floor column formwork constructionchiyman (0 votes)
Ground floor slab completed. starting to build the formwork for the Ground floor to first floor columnschiyman (0 votes)
Completed Ground slab brushed finish ready to accept floor tiling later onchiyman (0 votes)
Piles of Sand and stone for concrete mixingI should have insisted that a wooden structure be constructed to hold the sand and stone as just dumping it on the ground and using it caused a lot of wastage and required a big clean up later on. chiyman (0 votes)
Just about ready to remove the forms.chiyman (0 votes)
Still waiting for concrete to cure!chiyman (0 votes)
Concrete poured i and waiting for it to cure before removal of the forms.chiyman (0 votes)