|
Top rated - User galleries |
The connection pipe from the toilet to the collection tank.chiyman (0 votes)
|
|
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiyman (0 votes)
|
|
Ground floor Bathroom waste water pipework placed in position.chiyman (0 votes)
|
|
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiyman (0 votes)
|
|
Ground slab formwork completed and ready for the pourchiyman (0 votes)
|
|
Groundfloor formwork completed. Our construction workers lived in the tent which can been seen in the picture. They considered this to be more "professional" than constructing their own temporary accommodation!!chiyman (0 votes)
|
|
Ground floor formwork completedchiyman (0 votes)
|
|
Ground floor formwork completedchiyman (0 votes)
|
|
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperatelychiyman (0 votes)
|
|
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiyman (0 votes)
|
|
Ground floor slab completed - the part nearest the concrete mixer will be brushed once it has semi cured.chiyman (0 votes)
|
|
Everything ready for pouring the Ground floor slabchiyman (0 votes)
|
|
5254 files on 438 page(s) |
|
|
|
|
|
232 | |
|
|
|
|
|
|
|