DSCF5038.JPG
Placing the first floor pre cast slabs, removal of first floor beam formwork and placement of first floor slab mesh reinforcement.chiyman00000
(0 votes)
DSCF5037.JPG
Precast slabs in place forming the first floor - note the hole left is for the stairwell.chiyman00000
(0 votes)
DSCF5031.JPG
Lifting the precast ploor slabs into position on the first floor beams
chiyman00000
(0 votes)
DSCF5045.JPG
Roofing material and steel in the background.chiyman00000
(0 votes)
DSCF5044.JPG
First Floor Beams completed - formwork will be removed once the concrete has properly cured.chiyman00000
(0 votes)
DSCF5043.JPG
Completed First floor beams - awiting removal of formwork once the concrete has cured.chiyman00000
(0 votes)
DSCF5042.JPG
The larger white dog was in fact a male. I think the puppy was hungry. The dog then urinated on the puppy!! which made the construction worker owner rather cross!chiyman00000
(0 votes)
DSCF5041.JPG
Placing the steel reinforing mesh on the first floor precast slabschiyman00000
(0 votes)
DSCF4955.JPG
An evening meal washed down with plenty of Thai whisky at the end of a hard days work.chiyman00000
(0 votes)
DSCF4953.JPG
Ground floor slab formwork almost completed.chiyman00000
(0 votes)
DSCF4952.JPG
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.chiyman00000
(0 votes)
DSCF4951.JPG
Bathroom drainage connections placed befor pouring the ground floor slabchiyman00000
(0 votes)