Blockwork wall and bottom window lintel in placechiyman (0 votes)
|
|
Door lintel formwork being put in placechiyman (0 votes)
|
|
Blokwork wall with bottom window lintel steelwork being placedchiyman (0 votes)
|
|
First floor columns complete, roof ring beam being constructed from steel.The roof ring beam is commected to the top of the columns by welding to the reinforcement protrouding form the top of the column. An RC beam will also be constructed as a lintel for the large upstairs bedroom window - the formwork for this can be seen. I tried to make sure that safety on site was as good as possible but Thai people have their own way of doing things!! Fortunately he didnt fall off and indeed the whole project has been completed without any accident on site.
chiyman (0 votes)
|
|
Placing blockwork - note the steel reinforcement placed in the columns and embedded in the cement between each course of block.chiyman (0 votes)
|
|
Unloading Precast concrete slabschiyman (0 votes)
|
|
Pre Cast Concrete slabs being unloaded directly to the first floor beamschiyman (0 votes)
|
|
First Floor Concrete beams with partial removal of formwork ready for receiving the precast first floor slabs. I was very happy with the quality of the beams.chiyman (0 votes)
|
|
Precast slab delivery/unloadingchiyman (0 votes)
|
|
Pre cast concrete slabs used to form the first floor being deliveredchiyman (0 votes)
|
|
A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.chiyman (0 votes)
|
|
Precast Slabs placed and formwork ready for pouring 50mm cover of concretechiyman (0 votes)
|
|