DSCF5070.JPG
chiyman00000
(0 votes)
DSCF5090.JPG
Platforms for construction of the roof which was very high - about 5m for eaves to top ridge. I wanted to have the roof as the mail recognisable feature of the house and was prepared to pay the additional cost for this.chiyman00000
(0 votes)
DSCF5078.JPG
Seems like a lot of steel in that roof. Shame they didnt follow my original design - would have saved about 25% of the steel required - what can one do when you are not there to supervise directly?chiyman00000
(0 votes)
DSCF5077.JPG
Another view or roof construction progresschiyman00000
(0 votes)
DSCF5076.JPG
The roof construction wee under way - required a lot of Yuca poles as scaffoldingchiyman00000
(0 votes)
DSCF5075.JPG
Supporting yuca poles for the roof constructionchiyman00000
(0 votes)
DSCF5047.JPG
Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!chiyman00000
(0 votes)
DSCF5056.JPG
Good quality hardwood doorframe squared and supported before blockwork constructionchiyman00000
(0 votes)
DSCF5055.JPG
First Floor Columns completed with Formwork removedchiyman00000
(0 votes)
DSCF5054.JPG
Formwork for window lintel being constructedchiyman00000
(0 votes)
DSCF5053.JPG
Columns constructed and window lintel for full height windows in place. The formwork will be removed once the concrete has curedchiyman00000
(0 votes)
DSCF5052.JPG
chiyman00000
(0 votes)