3 phase electric meter installedShastadad (0 votes)
Top of Trimmed PilingTop of piling showing concrete and steel rebar.
Photographed on 2012-04-16newhomepages (0 votes)
Overall ShotView from North(Back) West corner photographed on April 16th, 2012.newhomepages (0 votes)
Pilings Trimmed to FootingThey cut and whacked off the tops of the pilings above the Footing.
Photographed on 2012-04-16newhomepages (0 votes)
Waiting for Bank ApraisalThe bank sent someone this day to appraise the value of the property to help determine the loan details.
Photographed on 2012-04-12newhomepages (0 votes)
Trimming the PilingTrimming the Piling
Photographed on 2012-04-10newhomepages (0 votes)
Concrete FootingPhotographed on 2012-04-10newhomepages (0 votes)
Hole Dug Down for FootingHoles dug down for footing around pilings.
Photographed on 2012-04-08newhomepages (0 votes)
Sand and Rock for Concrete MixSand and Rock for Concrete Mix
Photographed on 2012-04-07newhomepages (0 votes)
Eleven Pilings Driven Down 18 MetersEleven Pilings Driven Down 18 Meters
Photographed on 2012-04-07newhomepages (0 votes)