happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > sjeng > nong bua

Top rated - nong bua
locatie_nieuw_huis.jpg
location of the home yust oposite the airport of nakhon phanomsjeng00000
(0 votes)
DSC01448.JPG
putting concreet in the formssjeng00000
(0 votes)
DSC01453.JPG
rebar for the columssjeng00000
(0 votes)
DSC01454.JPG
rebar fixed for the footingssjeng00000
(0 votes)
DSC01456.JPG
modern arttoiet for the crew putin place, take an old oildrum put it in a hole and place an old toilet on top.sjeng00000
(0 votes)
DSC01430.JPG
testingtyger is testing the quality of the rebar, dont cheat me again he thinkssjeng00000
(0 votes)
DSC01364.JPG
rebarrebar came in this morning. 6, 12 and 16 mm.
the livingroom 8x8 wil have no stick in the middle, so the collums have to be very strong, 6x16 mm rebar for the collums at the corners of the livingroom. and 6 x 16 mm for the gb and rb around the kivingroom.
sjeng00000
(0 votes)
DSC01358.JPG
footings23 more to gosjeng00000
(0 votes)
DSC01359.JPG
lady digging a hole for footinglady at work, in europ we would use an excavater or at least a guy to fix the jobsjeng00000
(0 votes)
DSC01355.JPG
buildingsitethe sticks for the hootings have been put in place.sjeng00000
(0 votes)
electric.JPG
electrictemp electric powersuplysjeng00000
(0 votes)
deep_water_well.JPG
deep water wellsjeng00000
(0 votes)
12 files on 1 page(s)

Debug Info 
Debug Output: show / hide