Side BeamU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozer00000
(0 votes)
IMG_1997.jpg
FormworkAnother view of the form work in place to secure the door frame to the adjacent walls. dozer00000
(0 votes)
IMG_1993.jpg
Prepping Door FrameNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozer00000
(0 votes)
IMG_1992.jpg
Nail PreppingNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozer00000
(0 votes)