Top rated - Structure
IMG_1470.jpg
Spacers Wired into PlaceSpacers work well for beams and columns to make sure that there is required clearance where the concrete will go and that the frame is not sitting on the ground or touching the formwork. dozer00000
(0 votes)
IMG_1457.jpg
Rebar Vertical SupportsWiring the vertical 6mm rebar into place each 20 cm. dozer00000
(0 votes)
IMG_1449.jpg
Corner FrameworkCorner section showing beam rebar intersection with the column. dozer00000
(0 votes)
IMG_1447.jpg
Concrete Delivery ChuteThis delivery chute was hand crafted from a split piece of 12 inch PVC pipe. dozer00000
(0 votes)
IMG_1443.jpg
Bathroom LoweredThe beam for the bathroom was lowered by 5 cm corresponding with the step down. dozer00000
(0 votes)
IMG_1430.jpg
Beam and Column IntersectionThe beam and column are contiguous rebar that will be concreted in place. dozer00000
(0 votes)
IMG_1428.jpg
Ground BeamThe rebar framework for the ground beam. The beams were 40 cm by 20 cm wide. The beams will sit on top of the existing soil level and the floor will sit on top of the beams. dozer00000
(0 votes)
IMG_1420.jpg
Support ColumnThe part of the column above the footing and below the ground.dozer00000
(0 votes)
IMG_1419.jpg
Poured Support ColumnA poured support column (the part of the column under the floor). The guide lines are visible which indicate where the middle of each column should be. dozer00000
(0 votes)
IMG_1418.jpg
Column FormworkThe formwork for the support column on top of the footing is done using cinder blocks which will stay in place after the pour. dozer00000
(0 votes)
IMG_1335.jpg
Column Framework set in PlaceThe column frameworks are held upright by using pieces of 1 x 3" timber. dozer00000
(0 votes)
IMG_1333.jpg
FootingFinishing off the top of one particular footing, height of 35 cm. dozer00000
(0 votes)