happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > changnoi > Week 8 - Groundfloor pour and finish upper ringbeams

Top rated - Week 8 - Groundfloor pour and finish upper ringbeams
Mum_s_Ensuite_area.jpg
Mums Ensuite before Concrete Pourchangnoi00000
(0 votes)
prep_GF_balconey.jpg
Prep for GF balconeychangnoi00000
(0 votes)
RB_with_formwork_removed.jpg
Ringbeams with framework removedchangnoi00000
(0 votes)
GF_WC_with_pipes_2.jpg
Prep for GF WC with pipeschangnoi00000
(0 votes)
height_pegs.jpg
Height Sticks for Concrete Pourchangnoi00000
(0 votes)
installing_dpc_2.jpg
Damp Proofing preparationchangnoi00000
(0 votes)
installing_dpc___mesh_4.jpg
Installing Damp Proofing & Meshchangnoi00000
(0 votes)
GF_cast_4_with_wc_pit.jpg
View of whole groundfloor after concrete pourThis shows the groundfloor after the pour from the back to the front on the right where the wc will bechangnoi00000
(0 votes)
GF_cast_4_with_wc_pit___pipes.jpg
Ground floor WC after concrete pourchangnoi00000
(0 votes)
GF_filled_with_damp_proof_pegs_and_mesh.jpg
Ground floor with damp proof and mesh laidchangnoi00000
(0 votes)
gf_mum_bedroom_with_bathroom_pit.jpg
Mums bedroom and Ensuite after the concrete pourchangnoi00000
(0 votes)
GF_WC_with_pipes.jpg
Prep for downstairs WCThis shows the pipework installed prior to the concrete pourchangnoi00000
(0 votes)