happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_1991.jpg
Gable Vent82 viewsThe gable vent is installed. dozer
IMG_2018.jpg
Kitchen Electric81 viewsThis is a switch and receptacle box that will go above the kitchen counter.dozer
IMG_1983.jpg
Wall Shot81 viewsThe walls are grooved for the vent pipes which will extend out through the roof. dozer
IMG_2100.jpg
Batten Material Installed81 viewsThe prefab aluminum alloy batten pieces installed over the roof structure.dozer
IMG_2134.jpg
Angle Cutting Tiles81 viewsTiles are angle cut to fit into one of the the roof valleys . dozer
IMG_3418.jpg
Roof Overhang Too Much81 viewsThe roof overhang was too great allowing birds to enter in the area between the overhang and the fascia board.dozer
IMG_1258.jpg
Nylon String for Column Layout80 viewsA nice heavy nylon string to be used in setting up the site layout (location of each column) which works better than the invisible fishing line commonly used. dozer
IMG_2012.jpg
Control Room80 viewsThe control room for the CCTV system and LAN. Each box accommodates 3 RG6 cables and there are boxes for the CAT5 internet cable plus electric. dozer
IMG_2110.jpg
Fixing Roof Level80 viewsAny areas of the roof that are 'slightly out of shape' as declared by the roofing engineer must be rectified by welding in a 1 by 1 inch riser to correct the level of the roof batten.dozer
DSCN0415.jpg
Side Walkway and Garden80 viewsThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozer
CTHP2FinishedView.youtube
Video Walkthrough80 viewsA quick video walk though of the project a while after completion. dozer
IMG_2771.jpg
Main Circuit Box; Bticino79 viewsThe Bticino circuit box with different size breakers for different electrical components throughout the house. dozer
437 files on 37 page(s) 9

Debug Info 
Debug Output: show / hide