happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_2028.jpg
Gable Covering88 viewsThe thinner shera brand fascia covering was used for the gables. dozer
IMG_2107.jpg
Batten Material87 viewsA close up of the batten material used to hold the ceramic tiles in place.dozer
IMG_2108.jpg
Batten Close Up87 viewsThe roof battens are screwed into the roof structure using special roofing screws (threaded with head of screw formed as drill bit to enable the screws to penetrate the metal with no pilot hole necessary).dozer
IMG_1721.jpg
Spacers applied to Edge of Rebar Frame86 viewsThe spacers were used to keep the rebar from coming too close to the edges of the forms. dozer
IMG_1860.jpg
Metal Spacer86 viewsA metal spacer is in place to set the position of the rebar during the walkway pour. It is good to use spacers in confined areas like this one which will not need to be walked on.dozer
IMG_1873.jpg
Walkway on Top of Septic86 viewsHere the walkway is being poured behind the house. dozer
IMG_1899.jpg
Lanko 70186 viewsThis is a high compressive strength non shrink grout which was used to top up any columns that were poured to an incorrect height.dozer
IMG_1820.jpg
Walkway86 viewsTouching up paint and creating the attic walkway. dozer
IMG_2109.jpg
Fixing Roof Level85 viewsWelding in a small riser to correct the roof level. dozer
IMG_2051.jpg
Kitchen Electric83 viewsElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozer
IMG_2223.jpg
Electric Running to Main Circuit83 viewsWhere the main electric control box will be. dozer
IMG_1995.jpg
Wood in Rafters83 viewsHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer
437 files on 37 page(s) 8

Debug Info 
Debug Output: show / hide