CPAC Roof Tile Engineer91 viewsThe tiling engineer from the company to do the roof tiling measuring and checking the roof structure so far. As they only lay down the tiles they must check that the roof structure is straight and able to hold the tile load. dozer
|
|
Cutting the Rafters91 viewsA guide line is used to ensure the rafters are cut at the proper point. dozer
|
|
Dry Tech at the Ridge Corner91 viewsThe final layer of dry tech material being laid in place at the ridge corner. dozer
|
|
Compacting Soil for Walkway90 viewsThe soil is compacted in the walkway which surrounds the house prior to the pour. dozer
|
|
Brooming the Wall90 viewsThe brooming is used as the final step to get the finish on the wall.dozer
|
|
Corner Weld90 viewsA corner section sitting on a column. They do eventually touch up paint all of the welds in the structure.dozer
|
|
Roof Interior90 viewsAn interior view of the roof. dozer
|
|
Water Level Established89 viewsLevel lines are established using the clear tubing. The lines are used during the build to establish the top most level of the columns and for the floor. dozer
|
|
Column Edging89 viewsThe columns are edged showing their outline, here pictured in a wall that has been rendered but yet to be painted.dozer
|
|
Dry Teching the Ridge89 viewsThe first layer of dry tech material is fitted on an aluminum rail on the ridge line by the dry tech installer. dozer
|
|
Bad Tile89 viewsA fairly innocuous looking ceramic tile, this one has a small fault (at the arrow) causing slight water leakage. The overall project had about 10 bad tiles and the slight water leakage could be easily spotted and repaired since no roof foil was used. dozer
|
|
Rendering with Sponge88 viewsA sponge is used to get the final finish on the wall.dozer
|
|