Prefab Valley Material97 viewsThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozer
Plastic Sheeting96 viewsPlastic sheeting is laid down no top of the 20 mm plywood walkway to protect it from rain.dozer
Dry Tech96 viewsThe two layers of dry tech materials being set in place by the installer. dozer
Metal Formwork95 viewsThe metal formwork for the columns is lowered into place. The ordered quantity of forms was enough to allow the columns to be poured in two groups with one week allowed for curing. dozer
Crack Void95 viewsA slight crack/void in a column probably due to inadequate vibration. Some small voids like this are OK as long as their aren't too many. dozer
Aerated Blocks95 viewsThe q con aerated blocks are glued into place. Each row is attached to the column with 6 mm rebar. dozer
Straight Edge95 viewsThe straight edge tool is used on the rough wall as the first step after the render has been applied.dozer
Wood Trowel95 viewsThe wood trowel is used after the straightedge tool to start getting a smooth finish.dozer
Post to be Topped Off95 viewsThis short post will be topped off with lanko 701 grout so the metal roof structure is sitting on concrete.dozer
Topper Formwork for Top of Columns94 viewsFor columns which are longer (due to being on lower ground) there is wood formwork placed on top of the metal formwork. The top most part of all the columns will align horizontally. dozer
15 cm Blocks94 viewsThere was an area of the house which required 20 cm wide blocks but unfortunately we had ordered 15 cm wide blocks. Here I am figuring out that you can use the 15 cm block anyway if you lay them on their side because all variations of block sizes are always 20 cm high (duh!!). dozer
Wire Mesh After Corner Added94 viewsThe wire mesh partially embedded in render after the corner has been squared. dozer