|
Most viewed - Cool Thai House Phase 2 |
Partially Finished Wall20 viewsThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozer
|
|
Finish at adjacent Wall20 viewsThe corner was just painted to blend from the untiled wall to the tiled wall.dozer
|
|
Concrete Slurry20 viewsThe mix used to concrete the granite counter top to the base.dozer
|
|
Weber Tile Adhesive19 viewsThe weber tile adhesive is applied to prep the surface for the engraving.dozer
|
|
Prep Back of Mural19 viewsThe adhesive is applied to the back of the engraving. dozer
|
|
Large Sandstone Engraving19 viewsThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozer
|
|
Engraving Frame18 viewsThe prepared frame for where the 75 kg. engraving will be placed.dozer
|
|
Finish at Wood Trim18 viewsThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozer
|
|
The other Wall18 views dozer
|
|
Rendered Surface17 viewsThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozer
|
|
Lower Section Tiled16 viewsPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozer
|
|
Finished Sandstone15 viewsThe small sandstone tiles mixed in the the 30 cm square tiles for effect.dozer
|
|
437 files on 37 page(s) |
|
|
|
|
|
|
|
|
|
36 |
|
|
|
|