20 x zoom23 viewsA snapshot of 20 to 1 zoom of the avetech speed dome.dozer
Distance view Speed dome23 viewsThe regular non zoomed view from the avetech speed dome.dozer
Nearing Completion22 viewsThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozer
Setting Bathroom Top in Place22 viewsSetting the bathroom granite into place. dozer
Faucet Hole Drilling22 viewsWater is applied to keep the bit from getting too hot. dozer
Applying Adhesive22 viewsThe granite installer is laying down the silicone adhesive.dozer
Finished Edge22 viewsThe finished and grouted edge/corner of the granite counter top. dozer
Service Ladder22 viewsThe service ladder as mounted to the wall. dozer
Completed Wall21 viewsThe completed wall with large sandstone engraving and small sandstone feature tiles.dozer
Final Cracks21 viewsAny slight openings are grouted by the installers.dozer
Desks Ready for Granite Top21 viewsThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozer
Decorative Standstone Carvings20 viewsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer