IMG_2684.jpg
Tile Washing29 viewsThe tiles are always prepared by immersion in fresh water prior to being laid. dozer
IMG_2118.jpg
Metal Divider on Floor29 viewsThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozer
IMG_2179.jpg
Attaching the Guide Bar29 viewsAttaching the guide bar to be used in fitting in the last row of cross members. dozer
DSCN0448.jpg
Undermount Ceramic Sink29 viewsAn undermount ceramic sink. The granite is cut at the factory using the actual sink as a guide.dozer
IMG_2274.jpg
Satillite Stand29 viewsThis is the satellite stand used to support the 6' dish. dozer
IMG_2597~0.jpg
Security Metal29 viewsWelding security metal in place. dozer
IMG_2838.jpg
Track29 viewsThe track is installed along the column. At the top is a metal plate which will hold the roll up mechanism.dozer
IMG_2178.jpg
Guide Bar28 viewsDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozer
IMG_2495.jpg
Final Adjustment Stove Top Area28 viewsFinal adjustment on the area where the stove top will fit in. dozer
IMG_2506.jpg
Faucet Holed On-Site28 viewsEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozer
DSCN0445.jpg
Undermount Stainless Sink28 viewsAn undermount stainless sink.dozer
IMG_2918.jpg
Metal Roof on Storage Shed28 viewsThis metal roof was welded on this storage shed after the old corrugated roofing became problematic. dozer