Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_2508.jpg
Undermount Sink Held in Place33 viewsThe under mount sinks are secured in place after the granite is set and left to dry. dozer
DSC03533.jpg
Installing the Outer Casing33 viewsThe outer casing is just a shell to hide the inner workings of the roll up door. The door rolls up into this casing. This is located on the upper inside. dozer
IMG_2841.jpg
Placing a Casing Panel33 viewsA metal casing panel is being fitted onto the support metal to cover the roll up mechanism on the left side of the door.dozer
IMG_2311.jpg
Completed Column33 viewsA view of a completed column. dozer
IMG_2712.jpg
Cement Grout being Applied32 viewsThe grout used is cement mixed with sand. dozer
IMG_2798.jpg
Pattern32 viewsGetting the pattern right requires the right tiler -- luckily we had the right guy (and gal) for the job.dozer
DSCN0352.jpg
Bezen Tiles Patio32 viewsThe patio tiles have held up well so far. dozer
DSCN0354.jpg
Aluminum Trim32 viewsOn the driveway we used aluminum trim edging.dozer
IMG_2451~0.jpg
Security Metal32 viewsThe welder used guides to ensure the spacing between the vertical bars was consistent. The long 1 by 1 is used as a horizontal guide. The work turned out very straight. dozer
DSC03531.jpg
Finished Casing32 viewsThe finished mechanism casing. The covering panels are riveted into place.dozer
IMG_2815.jpg
More Tiles in Place31 viewsThe outside rows are the guide and red guide lines are used to indicate where each pattern will go. dozer
DSCN0359.jpg
Kitchen Trim Transition31 viewsThe kitchen wall tiles transition to the wood trim. dozer
437 files on 37 page(s) 28