Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_2477.jpg
Cardboard Sheeting34 viewsCardboard rolls are used to protect the drying tiled surface prior to it being grouted. The cardboard rolls is widely available and is widely used in high end commercial projects.dozer
IMG_2577.jpg
Kitchen Tiles34 viewsThe smaller kitchen tiles being laid. Although it would be easy enough to get away with a wet mix one pass application, the tiler here also uses the dry mix two step process. Here the weber adhesive cement is being applied.dozer
IMG_2780.jpg
Drive Way Extra Rebar34 viewsExtra rebar is used in the driveway. One layer of rebar is already there, the tiler will add a second layer which sits in another 5 cm of concrete as he prepares the surface for tiling.dozer
IMG_2913.jpg
Scrubbing the Tiles34 viewsThe tiles are scrubbed with an acid mix to remove any cement residue. Later they will be treated with a silicone protectant. dozer
IMG_2339.jpg
Opening for Stove Top34 viewsAn opening for the stovetop within the poured counter. dozer
IMG_2566.jpg
Finished Secured Metal Partition34 viewsThe completed metal partition with door. dozer
IMG_2679.jpg
Outer Rows33 viewsThese are 'bezen' brand small tiles suitable for driveways and patios. The tiler will be using the outside rows as the basis for the pattern. Here straight lines are being generated using a red chalk string line. dozer
IMG_2817.jpg
Setting Tiles into Weber Adhesive33 viewsHere the adhesive material was laid down first and the tiles were set into it. dozer
IMG_2821.jpg
Setting an Edge33 viewsA edge is placed on the step up into one of the storage rooms.dozer
IMG_2686.jpg
Tile Spacer Guide33 viewsA tile is used as a spacer guide to ensure the proper distance between tiles.dozer
IMG_2075.jpg
Working on Top Mesh33 viewsThe top metal mesh work is additionally welded to the roof structure for support. dozer
IMG_2492.jpg
Granite Top Set33 viewsTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer