happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_2661.jpg
Wood Trim Cuts37 viewsAngle cutting the wood trim on a miter saw. Joints on two adjoining pieces are done at a 45 degree angle.dozer
IMG_2663.jpg
Wood Trim Nailed to Ceiling37 viewsThe wood trim pieces are nailed to the ceiling using a power gun. dozer
IMG_2671.jpg
Trim Wood37 viewsTrim wood applied around an exposed column. dozer
IMG_2469.jpg
Mixing Drymix36 viewsAnother batch of dry mix with the finished tile floor in the background.dozer
IMG_2579.jpg
Tile Placement36 viewsFitting a tile into place on the dry mix with the weber adhesive already applied. dozer
IMG_2645.jpg
Smoothing the Surface36 viewsThe straight edge tool is used to apply the proper slope to the surface.dozer
IMG_2693.jpg
Installing the Patterm36 viewsThe pattern is installed as per the design. dozer
IMG_2819.jpg
Grouting the Surface36 viewsA cement mix is applied over the top of the tiles and then sponged off to set the grout in place.dozer
IMG_1963.jpg
Walls Reinforced36 viewsThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozer
IMG_2682.jpg
Air Gun36 viewsThe air gun is used to nail the trim wood into place. dozer
IMG_2282.jpg
Column Edging36 viewsStraight lines are established for the column corners. dozer
IMG_2604.jpg
Applying Wall Putty to Ext Ceiling36 viewsUsing putty to cover the junction between the smart boards.dozer
437 files on 37 page(s) 25

Debug Info 
Debug Output: show / hide