IMG_2376.jpg
Tiling on the Inside39 viewsTiling on the inside of the cabinets.dozer
IMG_2112.jpg
Top Mesh39 viewsThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer
IMG_2677.jpg
Trim Wood39 viewsA piece of trim wood for the outside edges of the ceiling. Note that glue is applied prior to applying the piece to the ceiling where it is nailed in place. dozer
IMG_3535.jpg
Under Cabinet Stainless Rails39 viewsInstalling under cabinet stainless rails used to hang things (pots, pans, etc). dozer
DSCN0360.jpg
Finished Bathroom Section38 viewsA finished section of the bathroom wall tiles.dozer
IMG_2363.jpg
Tiled Table Leg38 viewsThe tiled and edged table leg prior to it being grouted.dozer
IMG_1950.jpg
Double Wall38 viewsThe double wall has a layer of poured re enforced concrete in the middle. dozer
IMG_2839.jpg
Split Panel Door38 viewsThis door was split between two panels, the one pictured is the small one. The rail is in the middle has a track on either side for each door section. The roll up mechanism can be seen mounted at the top of the door.dozer
IMG_2670.jpg
Wood Trim38 viewsWood trim is used on the outside edge and well as the corner of the step. dozer
IMG_2453.jpg
Two Step37 viewsThe granito tiles are first laid and leveled in dry pack and then weber adhesive is applied to the back of the tile.dozer
IMG_2458.jpg
Drymix37 viewsAnother shot of the tiles partially installed. Notice the guide line and dry mix concrete.dozer
IMG_2843.jpg
Finished Door from Inside37 viewsThis is a finished door as viewed from the inside. The casing on the top hides the roll up mechanism. dozer