Poured Concrete42 viewsThe concrete is poured within the formwork. dozer
|
|
Dryed Structure42 viewsThe dried structure after the forms have been removed. dozer
|
|
Glass Blocks42 viewsGlass blocks laid above a ring beam with spacers in place. dozer
|
|
Wood Trim Areas42 viewsAnother view of wood trim areas above the kitchen and study.dozer
|
|
Painting External Ceiling42 viewsPainting the external ceiling with a water based paint, timbershield. dozer
|
|
Tiling the Cabinet Interior41 viewsIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer
|
|
More Paint Application41 viewsRolling paint on the eves overhanging the gable. dozer
|
|
Granito Tiles40 viewsThese are the heavy granito tiles, each weighing appx 7.5 kg each. They are laid much like granite or marble because of their weight. Many 'tilers' don't know how to do a proper job with granito and I have seen it done wrong many times.dozer
|
|
Tiled Insert40 viewsThis opening is designed to accomodate a Kitzcho brand shelving insert. dozer
|
|
Glass Tiles39 viewsThe glass tiles under the installed cabinets.dozer
|
|
Outer Support39 viewsThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer
|
|
Rebar for Concrete39 viewsThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer
|
|