IMG_2338.jpg
Poured Concrete42 viewsThe concrete is poured within the formwork. dozer
IMG_2342.jpg
Dryed Structure42 viewsThe dried structure after the forms have been removed. dozer
IMG_2032.jpg
Glass Blocks42 viewsGlass blocks laid above a ring beam with spacers in place. dozer
IMG_2674.jpg
Wood Trim Areas42 viewsAnother view of wood trim areas above the kitchen and study.dozer
IMG_2617.jpg
Painting External Ceiling42 viewsPainting the external ceiling with a water based paint, timbershield. dozer
IMG_2353.jpg
Tiling the Cabinet Interior41 viewsIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer
IMG_2619.jpg
More Paint Application41 viewsRolling paint on the eves overhanging the gable. dozer
IMG_2452.jpg
Granito Tiles40 viewsThese are the heavy granito tiles, each weighing appx 7.5 kg each. They are laid much like granite or marble because of their weight. Many 'tilers' don't know how to do a proper job with granito and I have seen it done wrong many times.dozer
IMG_2362.jpg
Tiled Insert40 viewsThis opening is designed to accomodate a Kitzcho brand shelving insert. dozer
DSCN0357.jpg
Glass Tiles39 viewsThe glass tiles under the installed cabinets.dozer
IMG_2325.jpg
Outer Support39 viewsThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer
IMG_2334.jpg
Rebar for Concrete39 viewsThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer