 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_1187.jpg
A Melted PVC Joint44 viewsThe PVC joints for the piping that brings the water up from the pump are melted into place. dozer
IMG_1210.jpg
Lowing PVC into Place44 viewsHere a grooved section is being lowered into place. dozer
IMG_2401.jpg
Taping a Joint44 viewsTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozer
IMG_2393.jpg
Shelving Unit44 viewsThis opening is designed for another shelving unit (Kitchzo). dozer
IMG_2791.jpg
Hardware to Support Upper Cabinets44 viewsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozer
IMG_2611.jpg
Applying Wall Putty to Ext Ceiling44 viewsMore putty put in the cracks between the ceiling panels. dozer
IMG_1190.jpg
Deep Water Pump Assembly43 viewsPreparing the Franklin deep water pump to be submerged. dozer
IMG_1173.jpg
Pump Used for Circulating Water During Drilling43 viewsThis is the pump used for keeping water circulating during the drilling process. dozer
IMG_2327.jpg
Cabinet Walls43 viewsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer
IMG_2381.jpg
Tiling Complete43 viewsThe tiling and grouting of the cabinets are complete. dozer
IMG_1202.jpg
Inner PVC Water Line42 viewsThe inner PVC water line which is 1" is raised up and lowered into the lined bore hole with the pump on the other side. Note the rope attaches to the pump to aid in lowering it. dozer
DSCN0350.jpg
Bezen Tiles Driveway42 viewsThe driveway tiles.dozer
437 files on 37 page(s) 22