|
Most viewed - Cool Thai House Phase 2 |
A Melted PVC Joint44 viewsThe PVC joints for the piping that brings the water up from the pump are melted into place. dozer
|
|
Lowing PVC into Place44 viewsHere a grooved section is being lowered into place. dozer
|
|
Taping a Joint44 viewsTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozer
|
|
Shelving Unit44 viewsThis opening is designed for another shelving unit (Kitchzo). dozer
|
|
Hardware to Support Upper Cabinets44 viewsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozer
|
|
Applying Wall Putty to Ext Ceiling44 viewsMore putty put in the cracks between the ceiling panels. dozer
|
|
Deep Water Pump Assembly43 viewsPreparing the Franklin deep water pump to be submerged. dozer
|
|
Pump Used for Circulating Water During Drilling43 viewsThis is the pump used for keeping water circulating during the drilling process. dozer
|
|
Cabinet Walls43 viewsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer
|
|
Tiling Complete43 viewsThe tiling and grouting of the cabinets are complete. dozer
|
|
Inner PVC Water Line42 viewsThe inner PVC water line which is 1" is raised up and lowered into the lined bore hole with the pump on the other side. Note the rope attaches to the pump to aid in lowering it. dozer
|
|
Bezen Tiles Driveway42 viewsThe driveway tiles.dozer
|
|
437 files on 37 page(s) |
|
|
|
|
|
22 | |
|
|
|
|
|
|
|