happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_1473.jpg
Vent Pipe Wired46 viewsA 3/4" vent pipe wired in place. dozer
IMG_1992.jpg
Nail Prepping46 viewsNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozer
IMG_3656.jpg
Putting up the Curtains46 viewsThe curtain and curtain rails were bought from a curtain shop at jatujak market, price was reasonable and nice r looking that most. dozer
IMG_1167.jpg
Well Rig Gets to Land45 viewsJust enough clearance to get into the land. This is a utility gate not used as a regular entrance, as it allows entry from someone else's land (currently unoccupied). Was slated for removal, glad we kept it.dozer
IMG_1220.jpg
Prescored PVC Gets Thumbs Down45 viewsThe well digger did not like these prefabricated grooved PVC pipes so we returned them. These are weaker and tend to collapse under pressure.dozer
IMG_1228.jpg
PVC Pipe Specifications45 viewsThis was the PVC piping we used. 6" thickness rated at 8.5. dozer
IMG_2400.jpg
Plastering after Tape45 viewsThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozer
IMG_2564.jpg
Wood Trim Exterior45 viewsWood trim installed butting up against the fascia board. dozer
IMG_2052.jpg
Door Frameing45 viewsThe door frame is secured in place. Column supports are poured on the side of each door frame. dozer
IMG_2698.jpg
Squaring Window Opening45 viewsThe window installer shapes the opening if it is not exactly square. dozer
IMG_1169.jpg
Drill Rig with Drilling Shafts44 viewsThe drilling rig. The shafts in the foreground are for drilling and attach to the trucks drill harness. dozer
IMG_1172.jpg
Drill Rig Set Up44 viewsThe rig used to drill the hole with the shaft harness upright and in position. dozer
437 files on 37 page(s) 21

Debug Info 
Debug Output: show / hide