happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_2553.jpg
Metal Screen49 viewsAn aluminum based screening material being used here. This is much more expensive than the vinyl type eventually used and not noticeably more durable. dozer
IMG_2588.jpg
Wood Trim49 viewsWood trim installed around the columns by the ceiling guys needed to be reworked because some of the joints were not done properly. dozer
IMG_2814.jpg
Cabinets49 viewsKitchzo kitchen cabinets as installed. dozer
IMG_1182.jpg
Gas Melting Station48 viewsHere is the rig they used to melt the PVC piping in place. dozer
IMG_1224.jpg
Hand Scoring the PVC Pipes48 viewsHere the PVC pipe is grooved. The grooved pieces are not used in the first 8 meters (the top most part is non grooved). They are used at the bottom of the well to allow water to seep in and replenish the supply. dozer
IMG_2368.jpg
Drywall Sheeting48 viewsA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
IMG_2796.jpg
Mounting the Upper Cabinets48 viewsStarting to Mount the Upper Cabinetsdozer
IMG_2813.jpg
Installing Shelving Unit48 viewsThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer
IMG_2511.jpg
Exterior Ceiling Frame47 viewsInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer
IMG_2003~0.jpg
Lintel47 viewsThe form work for a lintel above a door opening. dozer
IMG_1179.jpg
Franklin Pump46 viewsA view of the pump without the exterior housing. dozer
IMG_1209.jpg
Cutting PVC for another Try46 viewsThis was the first well attempt. The lower portion collapsed and was discarded under ground. dozer
437 files on 37 page(s) 20

Debug Info 
Debug Output: show / hide