Most viewed - Cool Thai House Phase 2 |
![Filename=IMG_2553.jpg
Filesize=454KiB
Dimensions=960x1280
Date added=Sep 27, 2011 IMG_2553.jpg](albums/userpics/10002/thumb_IMG_2553.jpg)
Metal Screen49 viewsAn aluminum based screening material being used here. This is much more expensive than the vinyl type eventually used and not noticeably more durable. dozer
|
|
![Filename=IMG_2588.jpg
Filesize=238KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2588.jpg](albums/userpics/10002/thumb_IMG_2588.jpg)
Wood Trim49 viewsWood trim installed around the columns by the ceiling guys needed to be reworked because some of the joints were not done properly. dozer
|
|
![Filename=IMG_2814.jpg
Filesize=360KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2814.jpg](albums/userpics/10002/thumb_IMG_2814.jpg)
Cabinets49 viewsKitchzo kitchen cabinets as installed. dozer
|
|
![Filename=IMG_1182.jpg
Filesize=670KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1182.jpg](albums/userpics/10002/thumb_IMG_1182.jpg)
Gas Melting Station48 viewsHere is the rig they used to melt the PVC piping in place. dozer
|
|
![Filename=IMG_1224.jpg
Filesize=601KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1224.jpg](albums/userpics/10002/thumb_IMG_1224.jpg)
Hand Scoring the PVC Pipes48 viewsHere the PVC pipe is grooved. The grooved pieces are not used in the first 8 meters (the top most part is non grooved). They are used at the bottom of the well to allow water to seep in and replenish the supply. dozer
|
|
![Filename=IMG_2368.jpg
Filesize=161KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2368.jpg](albums/userpics/10002/thumb_IMG_2368.jpg)
Drywall Sheeting48 viewsA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
|
|
![Filename=IMG_2796.jpg
Filesize=313KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2796.jpg](albums/userpics/10002/thumb_IMG_2796.jpg)
Mounting the Upper Cabinets48 viewsStarting to Mount the Upper Cabinetsdozer
|
|
![Filename=IMG_2813.jpg
Filesize=276KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2813.jpg](albums/userpics/10002/thumb_IMG_2813.jpg)
Installing Shelving Unit48 viewsThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer
|
|
![Filename=IMG_2511.jpg
Filesize=254KiB
Dimensions=960x1280
Date added=Sep 27, 2011 IMG_2511.jpg](albums/userpics/10002/thumb_IMG_2511.jpg)
Exterior Ceiling Frame47 viewsInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer
|
|
![Filename=IMG_2003~0.jpg
Filesize=428KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2003~0.jpg](albums/userpics/10002/thumb_IMG_2003~0.jpg)
Lintel47 viewsThe form work for a lintel above a door opening. dozer
|
|
![Filename=IMG_1179.jpg
Filesize=555KiB
Dimensions=960x1280
Date added=Sep 26, 2011 IMG_1179.jpg](albums/userpics/10002/thumb_IMG_1179.jpg)
Franklin Pump46 viewsA view of the pump without the exterior housing. dozer
|
|
![Filename=IMG_1209.jpg
Filesize=416KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1209.jpg](albums/userpics/10002/thumb_IMG_1209.jpg)
Cutting PVC for another Try46 viewsThis was the first well attempt. The lower portion collapsed and was discarded under ground. dozer
|
|
437 files on 37 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
20 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|