Most viewed - Cool Thai House Phase 2 |
![Filename=IMG_2542.jpg
Filesize=308KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2542.jpg](albums/userpics/10002/thumb_IMG_2542.jpg)
Cutting Smart Board52 viewsThe smart board comes in sheets and is cut to size as needed. dozer
|
|
![Filename=IMG_2552.jpg
Filesize=455KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2552.jpg](albums/userpics/10002/thumb_IMG_2552.jpg)
Blue Vinyl Meshing52 viewsThe blue vinyl meshing being fixed into place. If there are any voids it is important to mention it and follow up and check to make sure it gets fixed because it is hard to get at later. dozer
|
|
![Filename=IMG_2701.jpg
Filesize=214KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2701.jpg](albums/userpics/10002/thumb_IMG_2701.jpg)
Aluminum Window Frame52 viewsAttaching the aluminum window frame to the sill. dozer
|
|
![Filename=DSCN0474.jpg
Filesize=227KiB
Dimensions=960x1280
Date added=Sep 27, 2011 DSCN0474.jpg](albums/userpics/10002/thumb_DSCN0474.jpg)
Shower Enclosure52 viewsThe shower enclosure glass and handle. The glass is 10 mm safety glass with stainless handles and fittings done by the aluminum window factory. dozer
|
|
![Filename=IMG_1206.jpg
Filesize=517KiB
Dimensions=960x1280
Date added=Sep 26, 2011 IMG_1206.jpg](albums/userpics/10002/thumb_IMG_1206.jpg)
Lining the Bore Hole51 viewsPlacing a scored PVC pipe in the bore hole. dozer
|
|
![Filename=IMG_2391.jpg
Filesize=176KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2391.jpg](albums/userpics/10002/thumb_IMG_2391.jpg)
Ceiling after Plaster51 viewsThe interior ceiling after taping and plastering prior to finishing sanding. dozer
|
|
![Filename=IMG_2543.jpg
Filesize=296KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2543.jpg](albums/userpics/10002/thumb_IMG_2543.jpg)
Affixing Screen51 viewsAffixing a piece of metal screen to the aluminum ceiling frame. dozer
|
|
![Filename=IMG_1997.jpg
Filesize=395KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_1997.jpg](albums/userpics/10002/thumb_IMG_1997.jpg)
Formwork51 viewsAnother view of the form work in place to secure the door frame to the adjacent walls. dozer
|
|
![Filename=IMG_1480.jpg
Filesize=412KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1480.jpg](albums/userpics/10002/thumb_IMG_1480.jpg)
Cutting Tool50 viewsThese cutting tools make it easy to get a nice cut on pvc. These are also required for cutting of the orange hot water flexi piping.dozer
|
|
![Filename=IMG_1993.jpg
Filesize=301KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_1993.jpg](albums/userpics/10002/thumb_IMG_1993.jpg)
Prepping Door Frame50 viewsNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozer
|
|
![Filename=IMG_2000.jpg
Filesize=402KiB
Dimensions=960x1280
Date added=Sep 27, 2011 IMG_2000.jpg](albums/userpics/10002/thumb_IMG_2000.jpg)
Side Beam50 viewsU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozer
|
|
![Filename=IMG_2398.jpg
Filesize=307KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2398.jpg](albums/userpics/10002/thumb_IMG_2398.jpg)
Service Entry49 viewsThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozer
|
|
437 files on 37 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
19 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|