Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_1491.jpg
Toilet Drain with Vent Opening55 viewsThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozer
IMG_1495.jpg
Drain Water Test55 viewsThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozer
IMG_2375.jpg
Drywall Piece Installation55 viewsA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozer
IMG_2389.jpg
Installing Service Entry55 viewsInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozer
IMG_3612.jpg
Repair Work55 viewsThis was not easy repair work done (because of lack of access) done by the wood working group. Part of the screen cover had not be laid correctly and there was an opening with no screen protection. dozer
IMG_3541.jpg
Side Door Fit55 viewsThe doors fit nicely in the frames.dozer
IMG_2350.jpg
Interior: Framework54 viewsThe interior framework is established for the drywall sheeting to be installed. The very beginning of the process is establishing a straight line for every level to be used (if there is a step there would be the step level and the main level). This is done using the water clear tubing method and then setting the level lines in red chalk.dozer
IMG_2352.jpg
Bedroom Installation54 viewsThe first thing done is that the level of the lower step of the ceiling is established around the outside perimeter. The frame is being set up for a lower step which extends outward 60 centimeters and is 15 centimeters deep. dozer
IMG_3611.jpg
Repairing Screen54 viewsFitting the screen into place over some spots that were inadvertently missed by the ceiling installer.dozer
DSCN0492.jpg
Ladder and Access54 viewsThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozer
IMG_2361.jpg
Drywall Sheeting Applied53 viewsThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozer
IMG_2510.jpg
Setting in the Cross Supports52 viewsSetting the cross supports into place for the exterior ceiling.dozer