|
Most viewed - Cool Thai House Phase 2 |
Cementing the Shower Floor60 viewsLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer
|
|
Above Screen Section60 viewsScreen section above the ceiling. dozer
|
|
Door Hinge60 viewsAttaching the door hinges to a sold wood door. 4 hinges are used to prevent any sagging. dozer
|
|
Bathroom #160 viewsThe bathroom off the study area. The enclosure is 10mm glass / stainless custom made for around 15k from the same guy that did the aluminum windows.dozer
|
|
Bathroom #260 viewsThere is a small granite sink unit in each bathroom. The sink is an under mount type.dozer
|
|
Floor Electric59 viewsThe openings for the floor electric in the study. dozer
|
|
Working on Circuit Box Installation59 viewsThe electrician installing the circuit box.dozer
|
|
A/C Unit Installed59 viewsOne A/C unit is fit into place.dozer
|
|
Installing a Ceiling Fan59 viewsThe electrician installing a 'Regene' ceiling fan with acrylic blades. The weight of the fan is supported by a metal beam welded to the roof structure. dozer
|
|
Satellite Installation59 viewsThe satellite installer installing the thaicom satellite dish. This could not be done by the electrician since the satellite installer has special equipment for tuning the equipment. The labor for the installation was 1500 b.dozer
|
|
Various PVC Pipes59 viewsShowing inbound water piping, a sink drain and vented toilet drain.dozer
|
|
Plan Bathroom + Kitchen Layout59 viewsThere are two bathrooms adjacent to each other. We continued the beam between the columns on the bathroom on the left for stability even though it is not shown in the plan.dozer
|
|
437 files on 37 page(s) |
|
|
|
|
|
16 | |
|
|
|
|
|
|
|