Most viewed - Cool Thai House Phase 2 |
Septic Covers64 viewsScraping the bronze septic lids after the concrete walkway pour. dozer
|
|
Sliding Aluminum Window64 viewsThere are three tracks, one for the screen (inside) and two for the window sections. dozer
|
|
Storage Unit Inside64 viewsAnother view of the storage/utility room with metal racks currently used for storage. dozer
|
|
Recessed Shower Flooring63 viewsThe shower flooring is recessed to create a step down into the shower enclosure. dozer
|
|
Columns and Utility Units63 viewsThe second utility/storage unit has a split roll up door. Each unit is about 4m wide x 6 m long. There are overall 30 columns throughout the project.dozer
|
|
Shower Enclosure Beam62 viewsA ground beam is set up to be poured where the shower enclosure will go. dozer
|
|
Drain Pipes / Inbound Water62 viewsAll of the PVC piping is wired into place prior to setting in concrete to prevent it from angling during the pour. dozer
|
|
Vented Roof Tile62 viewsThe vented roof tile with plastic covering. The top will be cut for the stainless vents to go through and silicone sealed. dozer
|
|
Vented Toilet Elbow62 viewsShowing a vented toilet elbow as to be used in both bathrooms. The vent hole in this case is 6 hun (large than 1 inch smaller that 1.5 inches) but can be purchased in various sizes. Venting important to prevent slow flowing toilets. dozer
|
|
Aluminum Rail Framework62 viewsInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozer
|
|
Upper Strap Connection62 viewsThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. dozer
|
|
Lower Strap Connection62 viewsThe strap used to hold the ceiling frame in place. dozer
|
|
437 files on 37 page(s) |
|
|
|
|
|
14 | |
|
|
|
|
|
|
|