Most viewed - Cool Thai House Phase 2 |
Leveling the Toilet Pipe72 viewsAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozer
|
|
Kitchen/Living Area72 viewsComing into the house there is a great room area which is an entry area, kitchen and study. dozer
|
|
Junction Boxes71 viewsThe PVC plastic junction boxes are set in place which the screw type connectors. dozer
|
|
Plumbing Help??71 viewsHelped install the pump and fixtures in the house but unfortunately messed up a pump washer and bolt which took 6 weeks to get a replacement from Mitsubishi. dozer
|
|
Drive Way and Roll Up Door70 viewsThe parking lot along with a 2m side covered area. There are two storage/utility rooms with roll up doors. The ceiling is done using Chang brand 'smart board' which is vented to allow air flow in the attic.dozer
|
|
Main Circuit Box69 viewsThe eventual location where the main circuit box will go. dozer
|
|
Recessed Light Fixture69 viewsA recessed light fixture with wire nut tapeless connections.dozer
|
|
Junction Box69 viewsA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer
|
|
1 and 1/2 bathrooms69 viewsThe view of the beam setup for 1 and 1/2 bathrooms. dozer
|
|
Rough Plumbing Layout69 viewsAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
|
|
Bathroom Layout69 viewsBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
|
|
Burying the PVC Pipe68 viewsThe PVC pipe will is being buried under where the driveway will be poured. The PVC pipe is a space holder for the HDPE underground electric conduit. dozer
|
|
437 files on 37 page(s) |
|
|
|
|
|
11 | |
|
|
|
|
|
|
|