Leveling the Toilet Pipe72 viewsAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozer
DSCN0480.jpg
Kitchen/Living Area72 viewsComing into the house there is a great room area which is an entry area, kitchen and study. dozer
IMG_2224.jpg
Junction Boxes71 viewsThe PVC plastic junction boxes are set in place which the screw type connectors. dozer
IMG_2519.jpg
Plumbing Help??71 viewsHelped install the pump and fixtures in the house but unfortunately messed up a pump washer and bolt which took 6 weeks to get a replacement from Mitsubishi. dozer
DSCN0475.jpg
Drive Way and Roll Up Door70 viewsThe parking lot along with a 2m side covered area. There are two storage/utility rooms with roll up doors. The ceiling is done using Chang brand 'smart board' which is vented to allow air flow in the attic.dozer
IMG_2261.jpg
Main Circuit Box69 viewsThe eventual location where the main circuit box will go. dozer
IMG_2861.jpg
Recessed Light Fixture69 viewsA recessed light fixture with wire nut tapeless connections.dozer
DSCN0465.jpg
Junction Box69 viewsA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer
IMG_1516.jpg
1 and 1/2 bathrooms69 viewsThe view of the beam setup for 1 and 1/2 bathrooms. dozer
IMG_1729.jpg
Rough Plumbing Layout69 viewsAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
IMG_1879.jpg
Bathroom Layout69 viewsBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
IMG_1611.jpg
Burying the PVC Pipe68 viewsThe PVC pipe will is being buried under where the driveway will be poured. The PVC pipe is a space holder for the HDPE underground electric conduit. dozer