|
Most viewed - Cool Thai House Phase 2 |
Starting the Roof79 viewsStarting to put up the roof structure. dozer
|
|
Kitchen79 viewsThe ceilings in the kitchen and great room area are stepped. There counter is granite and there is a side table for dining or sitting. The refrigerator will eventually go to the right of the sink (where the brooms are). dozer
|
|
Partially Dug Septic78 viewsThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozer
|
|
Orange Flexi Tubing78 viewsThe orange flexi tubing works great for hot water plumbing. With the fittings at over 100 b and the per meter cost at about 100 b it is normally not selected or used in most projects except those with the owner directly buying the materials. dozer
|
|
PVC Roof Venting78 viewsThe 3/4" PVC roof venting which vents the toilets, sinks and drain pipes. On top of this the septics are also vented, but venting the other appliances helps prevent vacuums and subsequently poor water flow. dozer
|
|
Attic Walkway78 viewsThis allows for easier access to the attic area. Created from two parallel steel tubing beams with C section rib supports and 20mm grade A plywood as the walkway. dozer
|
|
Roof Overhang Repair75 viewsThe conwood fascia is cut down to allow the roof tiles to be replaced with a tighter fit. dozer
|
|
Neat Conduit Layout74 viewsConduit positioned in preparation for the recessed lighting and other ceiling electrics.dozer
|
|
Roof Vents74 viewsThese roof vents were custom made of stainless and fit through the special vent tiles.dozer
|
|
Vent Pipe73 viewsThe 6 hun vent pipes to be extended up and routed through the specialty roof tiles which have an opening and plastic sleeve. dozer
|
|
Wire Nut Connectors72 viewsTop view of the yellow electrical conduit and electric wires being attached with wire nut tapeless connection points and then being run into the top of the down light with white flexi conduit. dozer
|
|
Connection to Underground Wiring72 viewsThe connection from the meter to the underground wiring via the HDPE underground conduit and a connection cover plate. dozer
|
|
437 files on 37 page(s) |
|
|
|
|
|
10 | |
|
|
|
|
|
|
|