Staggered Ground Beam250 viewsA staggered ground beam design to accommodate for unevenness in the ground level.
dozer
IMG_3965.JPG
20 cm. Thick Lintel250 viewsThis shows a finished 20 cm. lintel above the glass blocks.
dozer
IMG_4039.JPG
Facia Board249 viewsThe synthetic concrete composite facia board, brand Sherara, was used. It is durable, easy to install, and not overly expensive.dozer
DSC03166.JPG
Roof Valley248 viewsA scored 1 meter wide strip of rust resistant galvanized is used in the roof valley. A leak proof valley requires a wide piece of metal to ensure that water doesn't splash in during heavy storms. dozer
IMG_4174.JPG
External Color Render Application246 viewsThe external color render is applied over a rough dry coat of non color render. dozer
DSC03201.JPG
Interior Brick work246 viewsRed bricks are used on the interior walls, which when affixed with concrete are much stronger than the regular cinder blocks.dozer
DSC03069.JPG
Rough Coat Render245 viewsThis shows a color coat of render being applied over a dried rough coat render. There is a certain technique which we employed after some initial missteps to get the block outline not to show through to the color coat.dozer
IMG_3083.JPG
Form work for ground beam243 viewsThe wood form work to support the pour of the ground beam which sits on the footing. The ground beam will be 10 centimeters wide by about 20 centimeters deep.
dozer
DSC03079.JPG
Steel Strength242 viewsThe steel distributors in general use a system for strength specification which is meaningless structural engineers. The standard strength specification as indicated here is stamped on the rebar and conforms to an SDxx format. This SD30 used here means that it would require a 30 kg. weight to permanently deform a 1 mm strand of this steel. dozer
IMG_4058.JPG
Applying Roof Tiles242 viewsRoof tiles being set in place.dozer
IMG_3917.JPG
240 viewsAnother shot of the bathroom wall, showing the decorate glass block inserts, which are, in the case of the bathroom, inserted 2 blocks thick. The outside block of these group of 4 blocks, which will be located in the shower stall, are opaque (the light will come in, but shapes cannot be made out inside the shower stall).
dozer
IMG_3087.JPG
Ground Beam239 viewsAfter a completed pour with the metal frames distributed evenly at 2.5 meter intervals.