happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
Photo-0021.jpg
Desks Ready for Granite Top21 viewsThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozer
IMG_2720.jpg
Decorative Standstone Carvings20 viewsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer
IMG_2767.jpg
Partially Finished Wall20 viewsThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozer
DSCN0340.jpg
Finish at adjacent Wall20 viewsThe corner was just painted to blend from the untiled wall to the tiled wall.dozer
IMG_2490.jpg
Concrete Slurry20 viewsThe mix used to concrete the granite counter top to the base.dozer
IMG_2752.jpg
Weber Tile Adhesive19 viewsThe weber tile adhesive is applied to prep the surface for the engraving.dozer
IMG_2755.jpg
Prep Back of Mural19 viewsThe adhesive is applied to the back of the engraving. dozer
DSCN0348.jpg
Large Sandstone Engraving19 viewsThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozer
IMG_2743.jpg
Engraving Frame18 viewsThe prepared frame for where the 75 kg. engraving will be placed.dozer
DSCN0341.jpg
Finish at Wood Trim18 viewsThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozer
DSCN0342_edited-1.jpg
The other Wall18 views dozer
IMG_2715.jpg
Rendered Surface17 viewsThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozer
943 files on 79 page(s) 78

Debug Info 
Debug Output: show / hide