|
Most viewed - House Construction |
Metal Face Plate23 viewsThe metal face plate needed to be replaced on the metal bar overhanging the roof ridgeline. Here is is being worked prior to welding and then lifting into place.dozer
|
|
Speed Dome Access23 viewsThe speed dome camera required a lot of service for various reasons and was in an extremely hard to get to location, up 7 or more meters from the ground. Here is the longest bamboo ladder we could find. dozer
|
|
20 x zoom23 viewsA snapshot of 20 to 1 zoom of the avetech speed dome.dozer
|
|
Distance view Speed dome23 viewsThe regular non zoomed view from the avetech speed dome.dozer
|
|
Nearing Completion22 viewsThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozer
|
|
Setting Bathroom Top in Place22 viewsSetting the bathroom granite into place. dozer
|
|
Faucet Hole Drilling22 viewsWater is applied to keep the bit from getting too hot. dozer
|
|
Applying Adhesive22 viewsThe granite installer is laying down the silicone adhesive.dozer
|
|
Finished Edge22 viewsThe finished and grouted edge/corner of the granite counter top. dozer
|
|
Service Ladder22 viewsThe service ladder as mounted to the wall. dozer
|
|
Completed Wall21 viewsThe completed wall with large sandstone engraving and small sandstone feature tiles.dozer
|
|
Final Cracks21 viewsAny slight openings are grouted by the installers.dozer
|
|
943 files on 79 page(s) |
|
|
|
|
|
|
|
|
77 | |
|
|
|
|