happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
DSCN0387.jpg
Camera Views26 viewsThe images can be seen on a local monitor or any computer throughout the house. Also enabled via port forwarding can be seen externally via the internet. dozer
IMG_3484.jpg
Speed Dome26 viewsThe exterior speed dome with 20 to 1 zoom. The camera is controllable from any computer on the network or over the internet (via the DVR). dozer
DSCN0433.jpg
Control Unit26 viewsThis avtech control unit has a 2 TB hd and allows for remote access/viewing of the camera's via the LAN or internet.dozer
IMG_8517.jpg
26 viewsThe rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer
IMG_2494.jpg
Sink Opening25 viewsThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozer
IMG_2928.jpg
Shelving for Storage25 viewsOK, not actually anything welded, but they did cut, assemble and put together several sets of shelving. dozer
DSCN0363.jpg
Camera UPS System25 viewsThis UPS accepts 220 V and outputs 12V DC. Since the output is 12V DC it can run longer on backup power.dozer
IMG_3423.jpg
Two Wires25 viewsThe setup for an exterior camera includes VFF electrical wire and CCTV Cable which can be specialty cable or Coaxial RG6 (the same as used for TV connections).dozer
IMG_3678.jpg
Servicing the Dome Camera25 viewsAccess isn't that easy as the dome camera is up very high. The first camera went out during a brown out (when it was still hooked up to a transformer) - here the replacement is wired up to switching power. dozer
DSCN0388.jpg
Exterior Camera25 viewsFinished exterior camera with external box for wires. The box is a standard bticino brand box with face plate. dozer
DSCN0392.jpg
Interior CCTV Camera25 viewsThis interior camera is rated 550 effective pixels resolution. The higher resolution cameras normally cost more.dozer
DSCN0470.jpg
Lower Step24 viewsThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozer
943 files on 79 page(s) 75

Debug Info 
Debug Output: show / hide