Most viewed - House Construction |

Bezen Tiles Patio32 viewsThe patio tiles have held up well so far. dozer
|
|

Aluminum Trim32 viewsOn the driveway we used aluminum trim edging.dozer
|
|

Security Metal32 viewsThe welder used guides to ensure the spacing between the vertical bars was consistent. The long 1 by 1 is used as a horizontal guide. The work turned out very straight. dozer
|
|

Finished Casing32 viewsThe finished mechanism casing. The covering panels are riveted into place.dozer
|
|

32 viewsThe poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozer
|
|

More Tiles in Place31 viewsThe outside rows are the guide and red guide lines are used to indicate where each pattern will go. dozer
|
|

Kitchen Trim Transition31 viewsThe kitchen wall tiles transition to the wood trim. dozer
|
|

Affixing Side Beam31 viewsThe side metal beams were affixed to the wall with anchor bolts. dozer
|
|

Rear Window31 viewsThe secured rear opening. dozer
|
|

Painters Start Primer31 viewsThe painters start applying primer to the ceiling. dozer
|
|

Finished Surface30 viewsThe finished surface prior to acid scrub to remove some signs of cement discoloration. dozer
|
|

Finished Granito Tiles30 viewsA finished section of granito floor tiles.dozer
|
|