Setting Tiles into Weber Adhesive33 viewsHere the adhesive material was laid down first and the tiles were set into it. dozer
Setting an Edge33 viewsA edge is placed on the step up into one of the storage rooms.dozer
Tile Spacer Guide33 viewsA tile is used as a spacer guide to ensure the proper distance between tiles.dozer
Working on Top Mesh33 viewsThe top metal mesh work is additionally welded to the roof structure for support. dozer
Granite Top Set33 viewsTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer
Undermount Sink Held in Place33 viewsThe under mount sinks are secured in place after the granite is set and left to dry. dozer
Installing the Outer Casing33 viewsThe outer casing is just a shell to hide the inner workings of the roll up door. The door rolls up into this casing. This is located on the upper inside. dozer
Placing a Casing Panel33 viewsA metal casing panel is being fitted onto the support metal to cover the roll up mechanism on the left side of the door.dozer
Completed Column33 viewsA view of a completed column. dozer
33 viewsCinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer
Cement Grout being Applied32 viewsThe grout used is cement mixed with sand. dozer
Pattern32 viewsGetting the pattern right requires the right tiler -- luckily we had the right guy (and gal) for the job.dozer