happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
DSCN0357.jpg
Glass Tiles39 viewsThe glass tiles under the installed cabinets.dozer
IMG_2325.jpg
Outer Support39 viewsThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer
IMG_2334.jpg
Rebar for Concrete39 viewsThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer
IMG_2376.jpg
Tiling on the Inside39 viewsTiling on the inside of the cabinets.dozer
IMG_2112.jpg
Top Mesh39 viewsThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer
IMG_2677.jpg
Trim Wood39 viewsA piece of trim wood for the outside edges of the ceiling. Note that glue is applied prior to applying the piece to the ceiling where it is nailed in place. dozer
IMG_3535.jpg
Under Cabinet Stainless Rails39 viewsInstalling under cabinet stainless rails used to hang things (pots, pans, etc). dozer
IMG_8518.jpg
39 viewsExisting section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozer
DSCN0360.jpg
Finished Bathroom Section38 viewsA finished section of the bathroom wall tiles.dozer
IMG_2363.jpg
Tiled Table Leg38 viewsThe tiled and edged table leg prior to it being grouted.dozer
IMG_1950.jpg
Double Wall38 viewsThe double wall has a layer of poured re enforced concrete in the middle. dozer
IMG_2839.jpg
Split Panel Door38 viewsThis door was split between two panels, the one pictured is the small one. The rail is in the middle has a track on either side for each door section. The roll up mechanism can be seen mounted at the top of the door.dozer
943 files on 79 page(s) 65

Debug Info 
Debug Output: show / hide