Most viewed - House Construction |

Glass Blocks42 viewsGlass blocks laid above a ring beam with spacers in place. dozer
|
|

Wood Trim Areas42 viewsAnother view of wood trim areas above the kitchen and study.dozer
|
|

Painting External Ceiling42 viewsPainting the external ceiling with a water based paint, timbershield. dozer
|
|

Upper Switch box + Lower Receptacle box42 viewsThe switch boxes + power points are secured fastened within the wall at the designated points. dozer
|
|

Plastic Wrap for Electric Outlet Cover Plate42 viewsMost don't seem to realize the amount of dust, paint and other construction debris which is airborne during a construction project, most of all the workers. All electric outlet cover plates + switch box plates should be plastic wrapped to prevent ugly hard to clean splatter. dozer
|
|

Fill Dirt after Posts42 viewsThis build used 4 meter tall prefabricated columns. They were set in footings and allowed to dry for 1 week, then fill dirt was brought in to raise the floor level. dozer
|
|

Fill Brought In42 viewsShows the level of the dirt raised after fill is brought in via a tractor. The tractor was 500 per hour. dozer
|
|

Tiling the Cabinet Interior41 viewsIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer
|
|

More Paint Application41 viewsRolling paint on the eves overhanging the gable. dozer
|
|

41 viewsThe upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer
|
|

Granito Tiles40 viewsThese are the heavy granito tiles, each weighing appx 7.5 kg each. They are laid much like granite or marble because of their weight. Many 'tilers' don't know how to do a proper job with granito and I have seen it done wrong many times.dozer
|
|

Tiled Insert40 viewsThis opening is designed to accomodate a Kitzcho brand shelving insert. dozer
|
|