Hardware to Support Upper Cabinets44 viewsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozer
Applying Wall Putty to Ext Ceiling44 viewsMore putty put in the cracks between the ceiling panels. dozer
44 viewsThe 3" hard wood is hammered into place to create a surface for the fascia board to be attached. dozer
Deep Water Pump Assembly43 viewsPreparing the Franklin deep water pump to be submerged. dozer
Pump Used for Circulating Water During Drilling43 viewsThis is the pump used for keeping water circulating during the drilling process. dozer
Cabinet Walls43 viewsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer
Tiling Complete43 viewsThe tiling and grouting of the cabinets are complete. dozer
43 viewsThe roof apex is 1.5 m above the prefabricated columns. Here the foreman is setting the roof apex in place. dozer
Inner PVC Water Line42 viewsThe inner PVC water line which is 1" is raised up and lowered into the lined bore hole with the pump on the other side. Note the rope attaches to the pump to aid in lowering it. dozer