Door Frameing45 viewsThe door frame is secured in place. Column supports are poured on the side of each door frame. dozer
|
|

Squaring Window Opening45 viewsThe window installer shapes the opening if it is not exactly square. dozer
|
|

Junction Box45 viewsClose up of junction box showing conduit (which is routed in the wall) securely affixed. dozer
|
|

Junction box45 viewsJunction box positioned in the wall.dozer
|
|

Closed Junction Box45 viewsThe sealed junction boxes are indeed secure and neat environment for electric wire connections.dozer
|
|

Poured Walkway45 viewsThe view after the walkway pour prior to the final smoothing of the concrete. This is hand mix concrete, you can tell it is about the right consistency since there is a minimum of water near the surface, and will become further evident during the final smoothing process. dozer
|
|

Drill Rig with Drilling Shafts44 viewsThe drilling rig. The shafts in the foreground are for drilling and attach to the trucks drill harness. dozer
|
|

Drill Rig Set Up44 viewsThe rig used to drill the hole with the shaft harness upright and in position. dozer
|
|

A Melted PVC Joint44 viewsThe PVC joints for the piping that brings the water up from the pump are melted into place. dozer
|
|

Lowing PVC into Place44 viewsHere a grooved section is being lowered into place. dozer
|
|

Taping a Joint44 viewsTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozer
|
|

Shelving Unit44 viewsThis opening is designed for another shelving unit (Kitchzo). dozer
|
|