Franklin Pump46 viewsA view of the pump without the exterior housing. dozer
|
|

Cutting PVC for another Try46 viewsThis was the first well attempt. The lower portion collapsed and was discarded under ground. dozer
|
|

Vent Pipe Wired46 viewsA 3/4" vent pipe wired in place. dozer
|
|

Nail Prepping46 viewsNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozer
|
|

Putting up the Curtains46 viewsThe curtain and curtain rails were bought from a curtain shop at jatujak market, price was reasonable and nice r looking that most. dozer
|
|

Control Unit46 viewsThe control unit for the breakers will be installed here. There are 6 zones attached to individual breakers. The breaker size depends on the load for that zone. Electrics are bticino matix. dozer
|
|

Electric Line in Wall46 viewsAfter the electric conduit is run up through the wall it is cemented over for a seamless finish render coat.dozer
|
|

Well Rig Gets to Land45 viewsJust enough clearance to get into the land. This is a utility gate not used as a regular entrance, as it allows entry from someone else's land (currently unoccupied). Was slated for removal, glad we kept it.dozer
|
|

Prescored PVC Gets Thumbs Down45 viewsThe well digger did not like these prefabricated grooved PVC pipes so we returned them. These are weaker and tend to collapse under pressure.dozer
|
|

PVC Pipe Specifications45 viewsThis was the PVC piping we used. 6" thickness rated at 8.5. dozer
|
|

Plastering after Tape45 viewsThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozer
|
|

Wood Trim Exterior45 viewsWood trim installed butting up against the fascia board. dozer
|
|