Gas Melting Station48 viewsHere is the rig they used to melt the PVC piping in place. dozer
|
|

Hand Scoring the PVC Pipes48 viewsHere the PVC pipe is grooved. The grooved pieces are not used in the first 8 meters (the top most part is non grooved). They are used at the bottom of the well to allow water to seep in and replenish the supply. dozer
|
|

Drywall Sheeting48 viewsA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
|
|

Mounting the Upper Cabinets48 viewsStarting to Mount the Upper Cabinetsdozer
|
|

Installing Shelving Unit48 viewsThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer
|
|

Position of Control Box48 viewsThis shows the position where the control box will go at the front right hand corner of the house. The house will have six zones all rigged with the appropriate size breakers.dozer
|
|

Exterior Ceiling Frame47 viewsInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer
|
|

Lintel47 viewsThe form work for a lintel above a door opening. dozer
|
|

Front Junction box area47 viewsThis shows the inside + outside junction boxes at the front of the house.dozer
|
|

Electric routing to the Pumping Station47 viewsHere the electric is routed around the exterior of the underground water tank. It will service the submerged artesian Franklin pump, the automatic pressure pump and the electronic solenoid (which controls the water level in the tank).dozer
|
|

47 viewsAfter the exterior walls have been rendered. dozer
|
|
|