happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
DSCN0474.jpg
Shower Enclosure52 viewsThe shower enclosure glass and handle. The glass is 10 mm safety glass with stainless handles and fittings done by the aluminum window factory. dozer
IMG_8945.jpg
Electric line being run to Pump52 viewsThis line will be routed to the pump station on the exterior of the house. For electric which is run through the garden area a protective concrete casing will be poured over the conduit.dozer
IMG_9445.jpg
Joint Repair52 viewsThe joints are puttied to make so the wood looks as if it were one piece. The joints are miter cut to fit together at a 45 degree angle.dozer
DSC02675.JPG
52 viewsThe interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer
IMG_1771.JPG
52 viewsApproximate wall thickness after rendering, about 8 cm. dozer
IMG_1206.jpg
Lining the Bore Hole51 viewsPlacing a scored PVC pipe in the bore hole. dozer
IMG_2391.jpg
Ceiling after Plaster51 viewsThe interior ceiling after taping and plastering prior to finishing sanding. dozer
IMG_2543.jpg
Affixing Screen51 viewsAffixing a piece of metal screen to the aluminum ceiling frame. dozer
IMG_1997.jpg
Formwork51 viewsAnother view of the form work in place to secure the door frame to the adjacent walls. dozer
IMG_1480.jpg
Cutting Tool50 viewsThese cutting tools make it easy to get a nice cut on pvc. These are also required for cutting of the orange hot water flexi piping.dozer
IMG_1993.jpg
Prepping Door Frame50 viewsNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozer
IMG_2000.jpg
Side Beam50 viewsU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozer
943 files on 79 page(s) 58