|

Most viewed - House Construction |

Shower Enclosure52 viewsThe shower enclosure glass and handle. The glass is 10 mm safety glass with stainless handles and fittings done by the aluminum window factory. dozer
|
|

Electric line being run to Pump52 viewsThis line will be routed to the pump station on the exterior of the house. For electric which is run through the garden area a protective concrete casing will be poured over the conduit.dozer
|
|

Joint Repair52 viewsThe joints are puttied to make so the wood looks as if it were one piece. The joints are miter cut to fit together at a 45 degree angle.dozer
|
|

52 viewsThe interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer
|
|

52 viewsApproximate wall thickness after rendering, about 8 cm. dozer
|
|

Lining the Bore Hole51 viewsPlacing a scored PVC pipe in the bore hole. dozer
|
|

Ceiling after Plaster51 viewsThe interior ceiling after taping and plastering prior to finishing sanding. dozer
|
|

Affixing Screen51 viewsAffixing a piece of metal screen to the aluminum ceiling frame. dozer
|
|

Formwork51 viewsAnother view of the form work in place to secure the door frame to the adjacent walls. dozer
|
|

Cutting Tool50 viewsThese cutting tools make it easy to get a nice cut on pvc. These are also required for cutting of the orange hot water flexi piping.dozer
|
|

Prepping Door Frame50 viewsNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozer
|
|

Side Beam50 viewsU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozer
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |
58 |  |
 |
 |
 |
|

|
|
|