Most viewed - House Construction |

Finished Surface54 viewsThis is the finished surface after smoothing. Close examination ensures that no hairline cracks are present. Cracking is a sign of improper rendering, either via improper mixing or application. dozer
|
|

Glass Blocks54 viewsA concrete mix the same as that used to lay tiles is used to firm the bricks in place. dozer
|
|

54 viewsThe exterior prior to rendering the surface. dozer
|
|

Drywall Sheeting Applied53 viewsThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozer
|
|

Capped Pipes53 viewsClose up of the caps temporarily used on the drain pipes.dozer
|
|

Typical Power Point Installation53 viewsThis shows a power point with a inbound cable co ax TV junction. There is also a telephone jack. Each power point and switch box is temporarily covered with this plastic to prevent splatter during painting and other construction activities. dozer
|
|

Surface Prep for Wall Tiles53 viewsThe surface here is being prepped for wall tiles. dozer
|
|

53 viewsMore work on the roof. The cross members are set in place. The helper in blue is holding the ground while the foreman welds. dozer
|
|

Setting in the Cross Supports52 viewsSetting the cross supports into place for the exterior ceiling.dozer
|
|

Cutting Smart Board52 viewsThe smart board comes in sheets and is cut to size as needed. dozer
|
|

Blue Vinyl Meshing52 viewsThe blue vinyl meshing being fixed into place. If there are any voids it is important to mention it and follow up and check to make sure it gets fixed because it is hard to get at later. dozer
|
|

Aluminum Window Frame52 viewsAttaching the aluminum window frame to the sill. dozer
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |