happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
IMG_1491.jpg
Toilet Drain with Vent Opening55 viewsThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozer
IMG_1495.jpg
Drain Water Test55 viewsThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozer
IMG_2375.jpg
Drywall Piece Installation55 viewsA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozer
IMG_2389.jpg
Installing Service Entry55 viewsInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozer
IMG_3612.jpg
Repair Work55 viewsThis was not easy repair work done (because of lack of access) done by the wood working group. Part of the screen cover had not be laid correctly and there was an opening with no screen protection. dozer
IMG_3541.jpg
Side Door Fit55 viewsThe doors fit nicely in the frames.dozer
IMG_9107.jpg
Inbound Electric Line tie in55 viewsThis shows where the inbound electric main line will enter the house, at the roof line above the patio.dozer
IMG_9299.jpg
Electric Routed to Wall Lighting55 viewsElectric is routed in the upper perimeter wall ring beam. dozer
IMG_9071.jpg
Smoothing the Render55 viewsAfter setting in a bit more the surface is worked smooth with the use of a render's darby in combination with a wet sponge. dozer
IMG_8930.jpg
Glass Block Offset55 viewsThe glass blocks are laid in to be even with the outside wall after rendering. This shows the bathroom wall, the clear blocks (opaque) are in the shower stall, the blue blocks are above the sink.dozer
IMG_9622.jpg
Level Line55 viewsA long clear plastic tubing is used to create a level line which will be used to set the top level for the floor tiles. The tube is filled with water, on one end a line is marked at the water line. At a different area perhaps several meters away another mark is made (in is a two man process). This two independent marks will be at the same level and measurement can be made from this point downwards to determine the target level for the tiles. dozer
IMG_2350.jpg
Interior: Framework54 viewsThe interior framework is established for the drywall sheeting to be installed. The very beginning of the process is establishing a straight line for every level to be used (if there is a step there would be the step level and the main level). This is done using the water clear tubing method and then setting the level lines in red chalk.dozer
943 files on 79 page(s) 55

Debug Info 
Debug Output: show / hide