happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
IMG_1492.jpg
Setting Toilet Drain56 viewsSetting the toilet at the correct distance per the plan. dozer
IMG_2351.jpg
Ceiling Secured Room56 viewsThis was the framing of the secured room where the ceiling is actually under a security level of metal welded together. The framework is tied to the security frame in this case, normally it is affixed to the roofing metal. dozer
IMG_2759.jpg
Door Painting56 viewsOil based paint (TOA Glipton) applied to louvered solid hardwood bathroom door. dozer
IMG_9274.jpg
Additonal Waterproofing Agent Applied to the Bottom56 viewsLanko K11 waterproofing agent is skim coated on the bottom (as shown) and will be applied to the sides of the enclosure as well. dozer
IMG_9409.jpg
Finished Submerged Water Tank56 viewsThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozer
IMG_9708.jpg
Heavy Duty Electronic Valve Solenoid Control56 viewsMost often you will find water tanks rigged with a toilet float type of on off valve. These cause the pump (in this case a heavy duty submerged franklin) to turn on an off frequently. This wastes electricity and keeps the water 'churning' all the time never giving any impurities time to settle to the bottom. With this type of electronic valve the desired off/on point can be adjusted by moving the middle yellow adjustment tube.dozer
IMG_9284.jpg
Front Brick Columns56 viewsThe front brick columns sit on either side of the drive way. The columns contain the electric conduit which is run up to the top to support the exterior wall lighting. The inside of the columns is filled with concrete.dozer
IMG_9340.jpg
Close Up of Drainage56 viewsThe drainage opening on the right side of the driveway. dozer
IMG_9301.jpg
Brick Column being Filled56 viewsThe brick column being filled with concrete. The top ring beam of the perimeter wall has been formed using form wood and is ready to be poured.dozer
20060911038.jpg
56 viewsInterior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozer
IMG_2834.JPG
56 viewsSide view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer
IMG_3485.jpg
Short One Switch55 viewsWe decided later we needed one additional eves light. There is a remote switch for the box so no hard wired switch is needed. dozer
943 files on 79 page(s) 54

Debug Info 
Debug Output: show / hide