Remote Switch57 viewsThe remote switch for the one extra exterior light that we wired in after the fact. dozer
|
|

Level Establish for Outer Step57 viewsThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozer
|
|

Two Types of Screening57 viewsTwo types of screening are installed under the smart board. The screen prevents insects entering the attic area since the smart board is vented. dozer
|
|

Adjusting the Opening57 viewsHere the door opening is being adjusted. dozer
|
|

Secured Storage57 viewsA utility/secured storage room with a bunk bed in it. The roll up doors in this unit are split with a small and large section. dozer
|
|

Tank Service57 viewsThe inside of the tank being cleaned of any debris.dozer
|
|

Lanko K11 Waterproofing57 viewsThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozer
|
|

Installing the Main Electric Panel57 viewsThe main electric panel contains associated breakers running from 10 w up to 32 w depending on the load of devices on the particular station. There are 6 stations in the house. All electric equipment is Bticino Matix.dozer
|
|

Inside view of Junction Box57 viewsOnly secure wire fasteners are used in a totally electric tape free installation. This means less to wear out and go wrong over time.dozer
|
|

Applying the Color Render Coat57 viewsThe color render coat is applied much the same as a normal render coat. In preparation however a previous coat was applied in a rough state and allowed to set for a week, which prevents the underlying block shape from bleeding through. dozer
|
|

Stone Trim being Applied57 viewsThe stone trim being cemented into place. The stone tiles are offset for effect. dozer
|
|

57 viewsAt this stage the roofing has been done (notice if it was heavy roofing the walls would be completed first). dozer
|
|