happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
IMG_1511.jpg
Still Digging Septics60 viewsThe septic chambers will each be about 2 meters deep and accommodate 6 round 1.2 m cement pieces. dozer
IMG_1505.jpg
Inbound Water Test60 viewsDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozer
IMG_1531.jpg
PVC Pipe Lids60 viewsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozer
IMG_1896.jpg
Cementing the Shower Floor60 viewsLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer
IMG_2864.jpg
Above Screen Section60 viewsScreen section above the ceiling. dozer
IMG_2703.jpg
Door Hinge60 viewsAttaching the door hinges to a sold wood door. 4 hinges are used to prevent any sagging. dozer
DSCN0484.jpg
Bathroom #160 viewsThe bathroom off the study area. The enclosure is 10mm glass / stainless custom made for around 15k from the same guy that did the aluminum windows.dozer
DSCN0489.jpg
Bathroom #260 viewsThere is a small granite sink unit in each bathroom. The sink is an under mount type.dozer
IMG_8769.jpg
Pipes after Floor Pour60 viewsA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
IMG_9097.jpg
Junction Box60 viewsThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozer
IMG_9218.jpg
Wall Columns60 viewsAs always, the columns for the perimeter wall are poured after the blocks are laid. This ties the blocks into the column and is much more durable.dozer
IMG_9068.jpg
Rendering Rod60 viewsThe rendering rod is used to level off the applied aerated block rendering compound after it has had time to set. dozer
943 files on 79 page(s) 50

Debug Info 
Debug Output: show / hide